|
|
|
|
shenhua group:yongzhou power plant 2*1050 mw project
|
|
china resources power: caofeidian plant 2*1000mw coal-firedgenerating units projects
|
|
power stations of east hope aluminum company in xinjiang
|
|
jinneng group: baode 2*660mw low calorific value coal power project
|
|
shenhua group:jiujiang power plant 2*1052 mw project
|
|
sureland was the total solution provider for the automatic fire extinguishing system for “three gorges” project
|
|
sureland has provided the automatic fire detection and extinguishing systems for many large power generation groups including datang, huaneng,huadian and guodian
|
|
provided fire detection and protection systems for many hydropower stations, power plants, and substations of state grid, china southern power grid, china resources power and erdos group etc.
|
|
laizhou power plant 2*1000 mw
|
|
shenergy group: pingshan 2*660mw supercritical coal fired generating unit project
|
|
inner mongolia togtoh power plant
|
|
shandong zouping weiqiao power plant 6*660mw
|
|
datong coal mine group:yanggao power plant
|
|
|
... |
|
|
|
|